Sitges Wind (28INR0017)

Sitges Wind is a 600.0 MW other interconnection project in Motley, Texas with a current status of operational. It is proposed to connect at Tap 345kV 59904 Cottonwood–60500 Edith Clarke.

600.0 MWCapacity
OperationalStatus
MotleyMarket
OtherTechnology

Project facts

Canonical nameSitges Wind
Queue ID28INR0017
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMotley
TechnologyOther
Capacity600.0 MW
StateTexas
CountyMotley
Point of interconnectionTap 345kV 59904 Cottonwood–60500 Edith Clarke
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2030-03-31
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata