Motley County, Texas — Interconnection Projects
The interXdata warehouse tracks 8 interconnection projects in Motley, Texas, representing 1,856 MW of requested capacity.
8Total projects
0Active
4Operational
3Withdrawn
1,856 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 806 MW |
| Other | 2 | 600 MW |
| Wind | 2 | 450 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sitges Wind | 28INR0017 | Other | 600.0 MW | operational | Motley, Texas |
| Sitges Wind 2 | 29INR0112 | Wind | 300.0 MW | withdrawn | Motley, Texas |
| Collier Ranch Solar | 25INR0516 | Solar | 253.0 MW | suspended | Motley, Texas |
| Buzios Solar | 24INR0399 | Solar | 252.0 MW | operational | Motley, Texas |
| Roaring Springs, LLC | 68458_5840 | Solar | 250.0 MW | operational | Motley, Texas |
| GEN-2006-025 | GEN-2006-025 | Wind | 150.0 MW | withdrawn | Motley, Texas |
| Buzios Solar - ADD ADDITIONAL MW CAPACITY | 25INR0254 | Solar | 51.0 MW | withdrawn | Motley, Texas |
| Buzios BESS SLF | 29INR0021 | Other | 0.0 MW | operational | Motley, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Nextera | 2 | 900 MW |
| Buzios Energy Storage, LLC | 1 | 0 MW |
| Roaring Springs Solar, LLC | 1 | 252 MW |
| Stafford Solar | 1 | 51 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Motley County.
Start tracking with interXdata