SkySealy2 (23INR0411)
SkySealy2 is a 150.0 MW gas interconnection project in Austin, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65.
150.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology
Project facts
| Canonical name | SkySealy2 |
|---|---|
| Queue ID | 23INR0411 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Gas |
| Capacity | 150.0 MW |
| State | Texas |
| County | Austin |
| Point of interconnection | tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65 |
| Requested (queue) date | 2023-05-14 |
| Proposed in-service date | 2025-06-01 |
| Operational date | — |
| Withdrawn date | 2024-06-20 |
| Developer | Sky Global Power Two, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata