Smith Mountain 138 kV (AG2-311 - moved to TC2)

Smith Mountain 138 kV is a 75.0 MW battery interconnection project in Bedford, Virginia with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameSmith Mountain 138 kV
Queue IDAG2-311 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity75.0 MW
StateVirginia
CountyBedford
Point of interconnection
Requested (queue) date2021-03-23
Proposed in-service date2031-07-01
Operational date
Withdrawn date2025-12-02
Developer
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.