Bedford County, Virginia — Interconnection Projects
The interXdata warehouse tracks 24 interconnection projects in Bedford, Virginia, representing 607 MW of requested capacity.
24Total projects
0Active
13Operational
8Withdrawn
607 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 7 | 433 MW |
| Battery | 2 | 150 MW |
| Other | 14 | 17 MW |
| Gas | 1 | 8 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Cloverdale - Joshua Falls 765 kV | AH1-368 | Solar | 125.0 MW | withdrawn | Bedford, Virginia |
| Whitehouse-Lone Gum 138 kV | AE1-064 | Solar | 102.1 MW | withdrawn | Bedford, Virginia |
| Lone Gum - Rockcastle 138 kV | AH1-381 | Solar | 99.5 MW | withdrawn | Bedford, Virginia |
| Meads Store 138 kV | AE1-130 | Solar | 83.0 MW | withdrawn | Bedford, Virginia |
| Smith Mountain 138 kV | AG2-311 - moved to TC2 | Battery | 75.0 MW | withdrawn | Bedford, Virginia |
| PJM Queue Project AG2-311 — Battery in Bedford, Virginia | AG2-311 | Battery | 75.0 MW | withdrawn | Bedford, Virginia |
| Rockcastle 138 kV | AG2-066 | Solar | 20.0 MW | withdrawn | Bedford, Virginia |
| Georgia-Pacific Big Island | 50479_GEN1 | Gas | 7.5 MW | operational | Bedford, Virginia |
| Cushaw 115 kV | AD1-084 | Other | 5.5 MW | operational | Bedford, Virginia |
| Bedford Solar (Oppidum) | 61126_12346 | Solar | 3.0 MW | operational | Bedford, Virginia |
| Snowden | 3821_4 | Other | 2.5 MW | operational | Bedford, Virginia |
| Snowden | 3821_5 | Other | 2.5 MW | operational | Bedford, Virginia |
| Orange Street G1 | 63173_1 | Other | 1.8 MW | operational | Bedford, Virginia |
| Orange Street G1 | 63173_P1 | Other | 0.6 MW | operational | Bedford, Virginia |
| Orange Street G1 | 63173_P3 | Other | 0.6 MW | operational | Bedford, Virginia |
| Orange Street G1 | 63173_P2 | Other | 0.6 MW | operational | Bedford, Virginia |
| Orange Street G1 | 63173_P4 | Other | 0.6 MW | operational | Bedford, Virginia |
| Orange Street G1 | 63173_P5 | Other | 0.6 MW | operational | Bedford, Virginia |
| Coleman Falls | 56313_CGH3 | Other | 0.5 MW | suspended | Bedford, Virginia |
| Coleman Falls | 56313_CGH2 | Other | 0.5 MW | suspended | Bedford, Virginia |
| Coleman Falls | 56313_CHG1 | Other | 0.5 MW | suspended | Bedford, Virginia |
| Georgia-Pacific Big Island | 50479_BHG2 | Other | 0.2 MW | operational | Bedford, Virginia |
| Georgia-Pacific Big Island | 50479_BHG1 | Other | 0.2 MW | operational | Bedford, Virginia |
| Whitehouse-Lone Gum 138 kV | AG2-246 | Solar | 0.0 MW | withdrawn | Bedford, Virginia |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Smith Mountain Storage, LLC | 1 | 75 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Bedford County.
Start tracking with interXdata