Snap Jaw BESS (23INR0217)

Snap Jaw BESS is a 201.3 MW other interconnection project in Harris, Texas with a current status of suspended. It is proposed to connect at tap 138kV 40941 La Porte - 40200 Bimont (Air Liquide).

201.3 MWCapacity
SuspendedStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameSnap Jaw BESS
Queue ID23INR0217
Statussuspended
Source statussuspended
MarketERCOT
TechnologyOther
Capacity201.3 MW
StateTexas
CountyHarris
Point of interconnectiontap 138kV 40941 La Porte - 40200 Bimont (Air Liquide)
Requested (queue) date2021-04-04
Proposed in-service date2028-06-01
Operational date
Withdrawn date
DeveloperMoccasin Pointe Grid, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata