Snap Jaw BESS (23INR0217)
Snap Jaw BESS is a 201.3 MW other interconnection project in Harris, Texas with a current status of suspended. It is proposed to connect at tap 138kV 40941 La Porte - 40200 Bimont (Air Liquide).
201.3 MWCapacity
SuspendedStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | Snap Jaw BESS |
|---|---|
| Queue ID | 23INR0217 |
| Status | suspended |
| Source status | suspended |
| Market | ERCOT |
| Technology | Other |
| Capacity | 201.3 MW |
| State | Texas |
| County | Harris |
| Point of interconnection | tap 138kV 40941 La Porte - 40200 Bimont (Air Liquide) |
| Requested (queue) date | 2021-04-04 |
| Proposed in-service date | 2028-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Moccasin Pointe Grid, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.