Soda Lake BESS 1 (23INR0501)

Soda Lake BESS 1 is a 203.9 MW other interconnection project in Crane, Texas with a current status of operational. It is proposed to connect at 138kV Soda Lake Substation (#76026).

203.9 MWCapacity
OperationalStatus
CraneMarket
OtherTechnology

Project facts

Canonical nameSoda Lake BESS 1
Queue ID23INR0501
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketCrane
TechnologyOther
Capacity203.9 MW
StateTexas
CountyCrane
Point of interconnection138kV Soda Lake Substation (#76026)
Requested (queue) date2022-09-02
Proposed in-service date
Operational date2026-07-08
Withdrawn date
DeveloperMendoza Trail BESS, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata