Sol Sienta Solar (28INR0136)

Sol Sienta Solar is a 28.4 MW solar interconnection project in Ward, Texas with a current status of withdrawn. It is proposed to connect at Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub.

28.4 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSol Sienta Solar
Queue ID28INR0136
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity28.4 MW
StateTexas
CountyWard
Point of interconnectionTap 138kV 1239 Coyanosa - 11238 Blair Lake Sub
Requested (queue) date
Proposed in-service date2028-06-01
Operational date
Withdrawn date2024-08-07
DeveloperSol Sienta Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata