Solar BESS Hybrid (63535_GEN03)

Solar BESS Hybrid is a 2.0 MW gas interconnection project in Cobb, Georgia with a current status of active.

2.0 MWCapacity
ActiveStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameSolar BESS Hybrid
Queue ID63535_GEN03
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketSOCO
TechnologyGas
Capacity2.0 MW
StateGeorgia
CountyCobb
Point of interconnection
Requested (queue) date
Proposed in-service date2027-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerCOBB ELECTRIC INC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata