Solar BESS Hybrid (63535_GEN04)

Solar BESS Hybrid is a 2.0 MW gas interconnection project in Cobb, Georgia with a current status of active.

2.0 MWCapacity
ActiveStatus
SOCOMarket
GasTechnology

Project facts

Canonical nameSolar BESS Hybrid
Queue ID63535_GEN04
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketSOCO
TechnologyGas
Capacity2.0 MW
StateGeorgia
CountyCobb
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-05-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerCOBB ELECTRIC INC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata