Solar (703)

Solar is a 6.8 MW solar interconnection project in Plymouth, Massachusetts with a current status of operational. It is proposed to connect at NSTAR Crystal Spring Substation 13.2 kV bus.

6.8 MWCapacity
OperationalStatus
SEMAMarket
SolarTechnology

Project facts

Canonical nameSolar
Queue ID703
Statusoperational
Source statusC
MarketSEMA
TechnologySolar
Capacity6.8 MW
StateMassachusetts
CountyPlymouth
Point of interconnectionNSTAR Crystal Spring Substation 13.2 kV bus
Requested (queue) date2018-01-24
Proposed in-service date
Operational date2019-04-23
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.