Solar Star North Herty Storage (24INR0174)

Solar Star North Herty Storage is a 125.9 MW other interconnection project in Angelina, Texas with a current status of operational. It is proposed to connect at 3307 Redland Switch 138 kV.

125.9 MWCapacity
OperationalStatus
AngelinaMarket
OtherTechnology

Project facts

Canonical nameSolar Star North Herty Storage
Queue ID24INR0174
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketAngelina
TechnologyOther
Capacity125.9 MW
StateTexas
CountyAngelina
Point of interconnection3307 Redland Switch 138 kV
Requested (queue) date2022-02-21
Proposed in-service date
Operational date2027-08-25
Withdrawn date
DeveloperSolar City
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata