Solara BESS 2 (24INR0379)

Solara BESS 2 is a 150.0 MW other interconnection project in Jones, Texas with a current status of operational. It is proposed to connect at 60387 Hendrick 138kV.

150.0 MWCapacity
OperationalStatus
JonesMarket
OtherTechnology

Project facts

Canonical nameSolara BESS 2
Queue ID24INR0379
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketJones
TechnologyOther
Capacity150.0 MW
StateTexas
CountyJones
Point of interconnection60387 Hendrick 138kV
Requested (queue) date2022-07-05
Proposed in-service date
Operational date2027-11-30
Withdrawn date
DeveloperCED Development Inc
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata