Solemio (19INR0093)

Solemio is a 81.4 MW solar interconnection project in Hopkins, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 1698 Sulphur Springs - 1814 Sulspg.

81.4 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSolemio
Queue ID19INR0093
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity81.4 MW
StateTexas
CountyHopkins
Point of interconnectiontap 138kV 1698 Sulphur Springs - 1814 Sulspg
Requested (queue) date2017-06-22
Proposed in-service date2023-01-10
Operational date
Withdrawn date2022-01-06
DeveloperSOLEMIO LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata