Somerset-Allegheny 115kV (I04)

Somerset-Allegheny 115kV is a 45.0 MW wind interconnection project in Somerset, Pennsylvania with a current status of withdrawn.

45.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameSomerset-Allegheny 115kV
Queue IDI04
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity45.0 MW
StatePennsylvania
CountySomerset
Point of interconnection
Requested (queue) date2002-03-29
Proposed in-service date2005-12-31
Operational date
Withdrawn date2005-04-14
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.