Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point (837)

Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point is a 1,200.0 MW generation interconnection project in Bristol, Massachusetts with a current status of active. It is proposed to connect at The proposed point of interconnection is: GRID Brayton PT 345kV.

1,200.0 MWCapacity
ActiveStatus
RIMarket
GenerationTechnology

Project facts

Canonical nameSomerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point
Queue ID837
Statusactive
Source statusA
MarketRI
TechnologyGeneration
Capacity1,200.0 MW
StateMassachusetts
CountyBristol
Point of interconnectionThe proposed point of interconnection is: GRID Brayton PT 345kV
Requested (queue) date2019-02-22
Proposed in-service date2031-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.