Soper Road Solar is a 20.0 MW solar interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at Perry Center Substation.

20.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameSoper Road Solar
Queue IDC24-241
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity20.0 MW
StateNew York
CountyWyoming
Point of interconnectionPerry Center Substation
Requested (queue) date2024-09-23
Proposed in-service date
Operational date
Withdrawn date
DeveloperGenesee River Solar, LLC
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata