SOUTH BEND (J4087)
SOUTH BEND is a 183.0 MW battery interconnection project in Blue Earth, Minnesota with a current status of withdrawn. It is proposed to connect at SOUTH BEND.
183.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | SOUTH BEND |
|---|---|
| Queue ID | J4087 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 183.0 MW |
| State | Minnesota |
| County | Blue Earth |
| Point of interconnection | SOUTH BEND |
| Requested (queue) date | 2025-10-07 |
| Proposed in-service date | 2029-06-01 |
| Operational date | 2029-06-01 |
| Withdrawn date | 2026-06-11 |
| Developer | — |
| Utility / transmission owner | NORTHERN STATES POWER COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata