South Plains I (14INR0025a)

South Plains I is a 200.0 MW wind interconnection project with a current status of operational. It is proposed to connect at White River (79505) tap CottonWood-Dermott.

200.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameSouth Plains I
Queue ID14INR0025a
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity200.0 MW
State
County
Point of interconnectionWhite River (79505) tap CottonWood-Dermott
Requested (queue) date2012-04-16
Proposed in-service date2015-10-31
Operational date2015-11-13
Withdrawn date
DeveloperSunEdison
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.