South Plant Substation 115 via 34.5 Feeders (CSUT-2025-6)

South Plant Substation 115 via 34.5 Feeders is a 100.0 MW battery interconnection project in El Paso, Colorado with a current status of operational. It is proposed to connect at South Plant Substation 115 via 34.5 Feeders.

100.0 MWCapacity
OperationalStatus
COMarket
BatteryTechnology

Project facts

Canonical nameSouth Plant Substation 115 via 34.5 Feeders
Queue IDCSUT-2025-6
Statusoperational
Source statusDISIS STAGE
MarketCO
TechnologyBattery
Capacity100.0 MW
StateColorado
CountyEl Paso
Point of interconnectionSouth Plant Substation 115 via 34.5 Feeders
Requested (queue) date2025-03-03
Proposed in-service date
Operational date2027-12-31
Withdrawn date
Developer
Utility / transmission ownerCSU

Cross-source records

This project is also observed in: csu-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata