South Tripoint BESS (28INR0150)

South Tripoint BESS is a 204.5 MW other interconnection project in Fayette, Texas with a current status of operational. It is proposed to connect at 7286 L_FAYETT8_1Y 138kV.

204.5 MWCapacity
OperationalStatus
FayetteMarket
OtherTechnology

Project facts

Canonical nameSouth Tripoint BESS
Queue ID28INR0150
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFayette
TechnologyOther
Capacity204.5 MW
StateTexas
CountyFayette
Point of interconnection7286 L_FAYETT8_1Y 138kV
Requested (queue) date2024-12-19
Proposed in-service date
Operational date2030-05-30
Withdrawn date
DeveloperSouth Triangle Energy, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata