Fayette County, Texas — Interconnection Projects

The interXdata warehouse tracks 15 interconnection projects in Fayette, Texas, representing 3,838 MW of requested capacity.

15Total projects
1Active
14Operational
0Withdrawn
3,838 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other72,715 MW
Solar3681 MW
Gas4242 MW
Battery1200 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Fayette Power Project6179_2Other615.0 MWoperationalFayette, Texas
Fayette Power Project6179_1Other615.0 MWoperationalFayette, Texas
Fayette Power Project6179_3Other460.0 MWoperationalFayette, Texas
Lightcycle Energy Storage29INR0249Other409.7 MWoperationalFayette, Texas
7V Solar21INR0351Solar240.6 MWoperationalFayette, Texas
7V Solar Ranch64239_7V1Solar240.0 MWoperationalFayette, Texas
Moonlit Bayou Storage27INR0137Other209.2 MWoperationalFayette, Texas
South Tripoint BESS28INR0150Other204.5 MWoperationalFayette, Texas
Staccato BESS25INR0189Other201.8 MWoperationalFayette, Texas
Staccato BESS70021_STACBBattery200.5 MWactiveFayette, Texas
Monument Hill Solar25INR0512Solar200.0 MWoperationalFayette, Texas
Winchester Power Park56674_CGT3Gas60.5 MWoperationalFayette, Texas
Winchester Power Park56674_CGT1Gas60.5 MWoperationalFayette, Texas
Winchester Power Park56674_CGT4Gas60.5 MWoperationalFayette, Texas
Winchester Power Park56674_CGT2Gas60.5 MWoperationalFayette, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Fayette County.

Start tracking with interXdata