Southeast Queue Project 143 — Gas in Volusia, Florida

Southeast Queue Project 143 — Gas in Volusia, Florida is a 1,180.0 MW gas interconnection project in Volusia, Florida with a current status of withdrawn. It is proposed to connect at Debary Substation.

1,180.0 MWCapacity
WithdrawnStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 143 — Gas in Volusia, Florida
Queue ID143
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyGas
Capacity1,180.0 MW
StateFlorida
CountyVolusia
Point of interconnectionDebary Substation
Requested (queue) date2016-05-05
Proposed in-service date2021-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata