Southeast Queue Project 199 — Solar in Citrus, Florida

Southeast Queue Project 199 — Solar in Citrus, Florida is a 74.9 MW solar interconnection project in Citrus, Florida with a current status of operational. It is proposed to connect at Citrus Combined Cycle Substation.

74.9 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 199 — Solar in Citrus, Florida
Queue ID199
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyCitrus
Point of interconnectionCitrus Combined Cycle Substation
Requested (queue) date2017-09-26
Proposed in-service date2022-09-16
Operational date2022-09-16
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.