Southeast Queue Project 210 — Solar in Suwannee, Florida
Southeast Queue Project 210 — Solar in Suwannee, Florida is a 74.9 MW solar interconnection project in Suwannee, Florida with a current status of operational. It is proposed to connect at Hickory Switching Station.
74.9 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology
Project facts
| Canonical name | Southeast Queue Project 210 — Solar in Suwannee, Florida |
|---|---|
| Queue ID | 210 |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | Florida |
| County | Suwannee |
| Point of interconnection | Hickory Switching Station |
| Requested (queue) date | 2017-12-22 |
| Proposed in-service date | 2023-04-03 |
| Operational date | 2023-04-03 |
| Withdrawn date | — |
| Developer | Duke Energy Florida, LLC |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata