Southeast Queue Project 240 — Solar in Levy, Florida is a 74.9 MW solar interconnection project in Levy, Florida with a current status of operational. It is proposed to connect at Chiefland Substation.

74.9 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 240 — Solar in Levy, Florida
Queue ID240
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyLevy
Point of interconnectionChiefland Substation
Requested (queue) date2018-10-12
Proposed in-service date2023-04-26
Operational date2023-04-26
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata