Southeast Queue Project 300 — Solar in Baker, Florida
Southeast Queue Project 300 — Solar in Baker, Florida is a 74.5 MW solar interconnection project in Baker, Florida with a current status of operational. It is proposed to connect at Duval-Raven 230kV.
74.5 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology
Project facts
| Canonical name | Southeast Queue Project 300 — Solar in Baker, Florida |
|---|---|
| Queue ID | 300 |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Baker |
| Point of interconnection | Duval-Raven 230kV |
| Requested (queue) date | 2017-06-27 |
| Proposed in-service date | — |
| Operational date | 2020-12-20 |
| Withdrawn date | — |
| Developer | FPL |
| Utility / transmission owner | Florida Power & Light |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata