Southeast Queue Project 304A — Solar in Highlands, Florida

Southeast Queue Project 304A — Solar in Highlands, Florida is a 74.9 MW solar interconnection project in Highlands, Florida with a current status of withdrawn. It is proposed to connect at Leisure Lakes Substation.

74.9 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 304A — Solar in Highlands, Florida
Queue ID304A
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyHighlands
Point of interconnectionLeisure Lakes Substation
Requested (queue) date2022-04-29
Proposed in-service date2024-05-01
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.