Southeast Queue Project 318 — Battery in Suwannee, Florida

Southeast Queue Project 318 — Battery in Suwannee, Florida is a 5.0 MW battery interconnection project in Suwannee, Florida with a current status of operational. It is proposed to connect at Suwannee 230 kV Substation.

5.0 MWCapacity
OperationalStatus
SoutheastMarket
BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 318 — Battery in Suwannee, Florida
Queue ID318
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyBattery
Capacity5.0 MW
StateFlorida
CountySuwannee
Point of interconnectionSuwannee 230 kV Substation
Requested (queue) date2022-12-05
Proposed in-service date2024-12-31
Operational date2024-12-31
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.