Southeast Queue Project 319 — Solar in Hernando, Florida

Southeast Queue Project 319 — Solar in Hernando, Florida is a 74.9 MW solar interconnection project in Hernando, Florida with a current status of suspended. It is proposed to connect at Brooksville-Bushnell East.

74.9 MWCapacity
SuspendedStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 319 — Solar in Hernando, Florida
Queue ID319
Statussuspended
Source statussuspended
MarketSoutheast
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyHernando
Point of interconnectionBrooksville-Bushnell East
Requested (queue) date2022-12-12
Proposed in-service date2026-06-01
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata