Southeast Queue Project 328 — Gas in Pinellas, Florida

Southeast Queue Project 328 — Gas in Pinellas, Florida is a 172.0 MW gas interconnection project in Pinellas, Florida with a current status of active. It is proposed to connect at Bartow Plant Substation.

172.0 MWCapacity
ActiveStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 328 — Gas in Pinellas, Florida
Queue ID328
Statusactive
Source statusactive
MarketSoutheast
TechnologyGas
Capacity172.0 MW
StateFlorida
CountyPinellas
Point of interconnectionBartow Plant Substation
Requested (queue) date2023-06-07
Proposed in-service date2024-12-30
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata