Southeast Queue Project 419A — Solar in Bay, Florida

Southeast Queue Project 419A — Solar in Bay, Florida is a 24.5 MW solar interconnection project in Bay, Florida with a current status of operational. It is proposed to connect at Marianna - Bay County 115kV line.

24.5 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 419A — Solar in Bay, Florida
Queue ID419A
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity24.5 MW
StateFlorida
CountyBay
Point of interconnectionMarianna - Bay County 115kV line
Requested (queue) date2021-01-13
Proposed in-service date
Operational date2023-04-30
Withdrawn date
DeveloperFPL
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.