Bay County, Florida — Interconnection Projects
The interXdata warehouse tracks 14 interconnection projects in Bay, Florida, representing 1,535 MW of requested capacity.
14Total projects
3Active
10Operational
1Withdrawn
1,535 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 3 | 620 MW |
| Solar | 8 | 524 MW |
| Battery | 2 | 350 MW |
| Other | 1 | 42 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Lansing Smith | 643_3S | Gas | 213.3 MW | operational | Bay, Florida |
| Lansing Smith | 643_3B | Gas | 203.2 MW | operational | Bay, Florida |
| Lansing Smith | 643_3A | Gas | 203.2 MW | operational | Bay, Florida |
| FL Queue Project 621 — Battery in Bay, Florida | 621 | Battery | 200.0 MW | withdrawn | Bay, Florida |
| FL Queue Project 620 — Battery in Bay, Florida | 620 | Battery | 150.0 MW | active | Bay, Florida |
| Mule Creek Renewable Energy Center | 65501_PV1 | Solar | 74.9 MW | operational | Bay, Florida |
| Duke Energy Florida, LLC | 074568 | Solar | 74.9 MW | active | Bay, Florida |
| Duke Energy Florida, LLC | 074572 | Solar | 74.9 MW | active | Bay, Florida |
| Bay Ranch Solar Power Plant | 65171_PV1 | Solar | 74.9 MW | operational | Bay, Florida |
| Sandy Creek Solar Power Plant | 64146_PV1 | Solar | 74.9 MW | operational | Bay, Florida |
| FPL Saw Palmetto Solar Energy Center | 65592_1 | Solar | 74.5 MW | operational | Bay, Florida |
| Southeast Queue Project 328B — Solar in Bay, Florida | 328B | Solar | 50.0 MW | operational | Bay, Florida |
| Lansing Smith | 643_CT1 | Other | 41.8 MW | operational | Bay, Florida |
| Southeast Queue Project 419A — Solar in Bay, Florida | 419A | Solar | 24.5 MW | operational | Bay, Florida |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Duke Energy Florida, LLC | 2 | 150 MW |
| FPL | 2 | 74 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: duke-def-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned); fpl-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Bay County.