Southeast Queue Project 425C — Solar+Battery in Leon, Florida

Southeast Queue Project 425C — Solar+Battery in Leon, Florida is a 75.0 MW solar+battery interconnection project in Leon, Florida with a current status of withdrawn. It is proposed to connect at Raven - Sinai 161kV line.

75.0 MWCapacity
WithdrawnStatus
SoutheastMarket
Solar+BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 425C — Solar+Battery in Leon, Florida
Queue ID425C
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar+Battery
Capacity75.0 MW
StateFlorida
CountyLeon
Point of interconnectionRaven - Sinai 161kV line
Requested (queue) date2022-02-19
Proposed in-service date2024-12-31
Operational date
Withdrawn date
DeveloperThird Party
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata