The interXdata warehouse tracks 18 interconnection projects in Leon, Florida, representing 1,153 MW of requested capacity.
18Total projects
3Active
13Operational
2Withdrawn
1,153 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 11 | 692 MW |
| Solar | 4 | 211 MW |
| Solar+Battery | 2 | 150 MW |
| Battery | 1 | 100 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Arvah B Hopkins | 688_2 | Gas | 259.2 MW | operational | Leon, Florida |
| Arvah B Hopkins | 688_CT 2A | Gas | 198.9 MW | operational | Leon, Florida |
| North Duke Energy Florida, LLC20 | FC100381 | Battery | 100.0 MW | active | Leon, Florida |
| Southeast Queue Project 425C — Solar+Battery in Leon, Florida | 425C | Solar+Battery | 75.0 MW | withdrawn | Leon, Florida |
| Southeast Queue Project 425D — Solar+Battery in Leon, Florida | 425D | Solar+Battery | 75.0 MW | withdrawn | Leon, Florida |
| Southeast Queue Project 424A — Solar in Leon, Florida | 424A | Solar | 74.5 MW | active | Leon, Florida |
| Southeast Queue Project 424B — Solar in Leon, Florida | 424B | Solar | 74.5 MW | active | Leon, Florida |
| Arvah B Hopkins | 688_GT3 | Gas | 60.5 MW | operational | Leon, Florida |
| Arvah B Hopkins | 688_GT4 | Gas | 60.5 MW | operational | Leon, Florida |
| FL Solar 4, LLC | 63187_FL4 | Solar | 42.0 MW | operational | Leon, Florida |
| CoTAL Solar Farm | 60582_PV1 | Solar | 20.0 MW | operational | Leon, Florida |
| Arvah B Hopkins | 688_IC2 | Gas | 18.8 MW | operational | Leon, Florida |
| Arvah B Hopkins | 688_IC3 | Gas | 18.8 MW | operational | Leon, Florida |
| Arvah B Hopkins | 688_IC5 | Gas | 18.8 MW | operational | Leon, Florida |
| Arvah B Hopkins | 688_IC1 | Gas | 18.8 MW | operational | Leon, Florida |
| Arvah B Hopkins | 688_IC4 | Gas | 18.8 MW | operational | Leon, Florida |
| Sub 12 | 61080_IC2 | Gas | 9.3 MW | operational | Leon, Florida |
| Sub 12 | 61080_IC1 | Gas | 9.3 MW | operational | Leon, Florida |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Third Party | 2 | 150 MW |
| FPL | 2 | 149 MW |
| North Duke Energy Florida, LLC20 | 1 | 100 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: duke-def-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.