Southeast Queue Project 46 — Nuclear in Levy, Florida

Southeast Queue Project 46 — Nuclear in Levy, Florida is a 1,150.0 MW nuclear interconnection project in Levy, Florida with a current status of withdrawn. It is proposed to connect at PEF Nuclear Substation.

1,150.0 MWCapacity
WithdrawnStatus
SoutheastMarket
NuclearTechnology

Project facts

Canonical nameSoutheast Queue Project 46 — Nuclear in Levy, Florida
Queue ID46
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyNuclear
Capacity1,150.0 MW
StateFlorida
CountyLevy
Point of interconnectionPEF Nuclear Substation
Requested (queue) date2006-12-12
Proposed in-service date2018-06-01
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata