Southeast Queue Project 52A — Solar in Hillsborough, Florida
Southeast Queue Project 52A — Solar in Hillsborough, Florida is a 74.5 MW solar interconnection project in Hillsborough, Florida with a current status of operational. It is proposed to connect at Grange Hall Substation, Hillsborough County, Florida.
Project facts
| Canonical name | Southeast Queue Project 52A — Solar in Hillsborough, Florida |
|---|---|
| Queue ID | 52A |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Hillsborough |
| Point of interconnection | Grange Hall Substation, Hillsborough County, Florida |
| Requested (queue) date | 2019-03-04 |
| Proposed in-service date | 2020-11-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tampa Electric Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata