Southeast Queue Project 57 — Coal in Citrus, Florida

Southeast Queue Project 57 — Coal in Citrus, Florida is a 4.0 MW coal interconnection project in Citrus, Florida with a current status of withdrawn. It is proposed to connect at Crystal River Substation.

4.0 MWCapacity
WithdrawnStatus
SoutheastMarket
CoalTechnology

Project facts

Canonical nameSoutheast Queue Project 57 — Coal in Citrus, Florida
Queue ID57
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyCoal
Capacity4.0 MW
StateFlorida
CountyCitrus
Point of interconnectionCrystal River Substation
Requested (queue) date2007-01-12
Proposed in-service date2012-03-01
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata