Southeast Queue Project 63B — Solar in Hillsborough, Florida

Southeast Queue Project 63B — Solar in Hillsborough, Florida is a 74.5 MW solar interconnection project in Hillsborough, Florida with a current status of withdrawn. It is proposed to connect at Mines Substation, Hillsborough County, Florida.

74.5 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 63B — Solar in Hillsborough, Florida
Queue ID63B
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyHillsborough
Point of interconnectionMines Substation, Hillsborough County, Florida
Requested (queue) date2019-09-16
Proposed in-service date2022-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata