Southeast Queue Project 84 — Gas in Levy, Florida

Southeast Queue Project 84 — Gas in Levy, Florida is a 223.0 MW gas interconnection project in Levy, Florida with a current status of withdrawn. It is proposed to connect at Levy Substation.

223.0 MWCapacity
WithdrawnStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 84 — Gas in Levy, Florida
Queue ID84
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyGas
Capacity223.0 MW
StateFlorida
CountyLevy
Point of interconnectionLevy Substation
Requested (queue) date2008-03-06
Proposed in-service date2025-06-01
Operational date
Withdrawn date
DeveloperDuke Energy Florida, LLC
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata