Southeast Queue Project 918039 — Solar in Cumberland, North Carolina

Southeast Queue Project 918039 — Solar in Cumberland, North Carolina is a 74.9 MW solar interconnection project in Cumberland, North Carolina with a current status of withdrawn. It is proposed to connect at ERWIN - FAYETTEVILLE EAST 230KV.

74.9 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 918039 — Solar in Cumberland, North Carolina
Queue ID918039
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity74.9 MW
StateNorth Carolina
CountyCumberland
Point of interconnectionERWIN - FAYETTEVILLE EAST 230KV
Requested (queue) date2023-09-29
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.