Southeast Queue Project IC-1199 — Solar+Battery in Lowndes, Georgia
Southeast Queue Project IC-1199 — Solar+Battery in Lowndes, Georgia is a 3.5 MW solar+battery interconnection project in Lowndes, Georgia with a current status of active. It is proposed to connect at Mission Pond Substation 115 kV Bus.
3.5 MWCapacity
ActiveStatus
SoutheastMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Southeast Queue Project IC-1199 — Solar+Battery in Lowndes, Georgia |
|---|---|
| Queue ID | IC-1199 |
| Status | active |
| Source status | active |
| Market | Southeast |
| Technology | Solar+Battery |
| Capacity | 3.5 MW |
| State | Georgia |
| County | Lowndes |
| Point of interconnection | Mission Pond Substation 115 kV Bus |
| Requested (queue) date | 2023-11-03 |
| Proposed in-service date | 2025-11-04 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Southern Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata