Southeast Queue Project LGE-CS2025-013 — Solar in Ballard, Kentucky
Southeast Queue Project LGE-CS2025-013 — Solar in Ballard, Kentucky is a 100.0 MW solar interconnection project in Ballard, Kentucky with a current status of active. It is proposed to connect at Grahamville - Wickliffe 161kV line tap.
100.0 MWCapacity
ActiveStatus
SoutheastMarket
SolarTechnology
Project facts
| Canonical name | Southeast Queue Project LGE-CS2025-013 — Solar in Ballard, Kentucky |
|---|---|
| Queue ID | LGE-CS2025-013 |
| Status | active |
| Source status | active |
| Market | Southeast |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | Kentucky |
| County | Ballard |
| Point of interconnection | Grahamville - Wickliffe 161kV line tap |
| Requested (queue) date | 2025-12-24 |
| Proposed in-service date | 2028-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Louisville Gas & Electric and Kentucky Utilities Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata