Ballard County, Kentucky — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Ballard, Kentucky, representing 524 MW of requested capacity.
6Total projects
1Active
0Operational
5Withdrawn
524 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 509 MW |
| Other | 1 | 15 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Southeast Queue Project LGE-GIS-2022-001 — Solar in Ballard, Kentucky | LGE-GIS-2022-001 | Solar | 125.0 MW | withdrawn | Ballard, Kentucky |
| Southeast Queue Project LGE-GIS-2019-002 — Solar in Ballard, Kentucky | LGE-GIS-2019-002 | Solar | 104.0 MW | withdrawn | Ballard, Kentucky |
| Southeast Queue Project LGE-CS2025-013 — Solar in Ballard, Kentucky | LGE-CS2025-013 | Solar | 100.0 MW | active | Ballard, Kentucky |
| Southeast Queue Project LGE-GIS-2019-014 — Solar in Ballard, Kentucky | LGE-GIS-2019-014 | Solar | 100.0 MW | withdrawn | Ballard, Kentucky |
| Southeast Queue Project LGE-GIS-2019-021 — Solar in Ballard, Kentucky | LGE-GIS-2019-021 | Solar | 80.0 MW | withdrawn | Ballard, Kentucky |
| MISO Queue Project G508 — Other in Ballard, Kentucky | G508 | Other | 15.0 MW | withdrawn | Ballard, Kentucky |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-05
Page data generated2026-08-05
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Ballard County.
Start tracking with interXdata