SOUTHLAND is a 375.0 MW solar interconnection project in Clark, Nevada with a current status of withdrawn. It is proposed to connect at Mohave Substation 500kV.

375.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameSOUTHLAND
Queue ID1336
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologySolar
Capacity375.0 MW
StateNevada
CountyClark
Point of interconnectionMohave Substation 500kV
Requested (queue) date2016-05-02
Proposed in-service date—
Operational date—
Withdrawn date2021-06-11
Developer—
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.