Southport Solar PV Project (C24-313)

Southport Solar PV Project is a 42.0 MW solar interconnection project in Chemung, New York with a current status of withdrawn. It is proposed to connect at Caton Ave. 115 kV Station.

42.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameSouthport Solar PV Project
Queue IDC24-313
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity42.0 MW
StateNew York
CountyChemung
Point of interconnectionCaton Ave. 115 kV Station
Requested (queue) date2024-10-02
Proposed in-service date
Operational date
Withdrawn date
DeveloperNew York Power Authority & LS Power Grid New York Corporation I
Utility / transmission ownerNYSEG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata