SP-Pecos Bend Solar C (19INR0020c)

SP-Pecos Bend Solar C is a 180.0 MW solar interconnection project in Pecos, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 76002 Bakersfield - 76005 SchneemanDr, ~ 11 mi E of Bakersfield..

180.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameSP-Pecos Bend Solar C
Queue ID19INR0020c
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity180.0 MW
StateTexas
CountyPecos
Point of interconnectiontap 345kV 76002 Bakersfield - 76005 SchneemanDr, ~ 11 mi E of Bakersfield.
Requested (queue) date2016-10-25
Proposed in-service date2020-05-15
Operational date
Withdrawn date2019-02-04
DeveloperSolar City
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata