SP TX-12B BESS (21INR0357)

SP TX-12B BESS is a 25.1 MW other interconnection project in Upton, Texas with a current status of operational. It is proposed to connect at 132943 SPTX12B 138kV.

25.1 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameSP TX-12B BESS
Queue ID21INR0357
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity25.1 MW
StateTexas
CountyUpton
Point of interconnection132943 SPTX12B 138kV
Requested (queue) date2019-06-16
Proposed in-service date2023-05-20
Operational date2023-05-31
Withdrawn date
DeveloperVESI 37 LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata