Sparkl BESS (20INR0299)

Sparkl BESS is a 20.0 MW battery interconnection project in Guadalupe, Texas with a current status of suspended.

20.0 MWCapacity
SuspendedStatus
GuadalupeMarket
BatteryTechnology

Project facts

Canonical nameSparkl BESS
Queue ID20INR0299
Statussuspended
Source status
MarketGuadalupe
TechnologyBattery
Capacity20.0 MW
StateTexas
CountyGuadalupe
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectsuspendedhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata