SPC Bloom BESS (22INR0445)

SPC Bloom BESS is a 100.0 MW battery interconnection project in Victoria, Texas with a current status of active. It is proposed to connect at 8911 Black Bayou 138kV.

100.0 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameSPC Bloom BESS
Queue ID22INR0445
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity100.0 MW
StateTexas
CountyVictoria
Point of interconnection8911 Black Bayou 138kV
Requested (queue) date2020-12-03
Proposed in-service date2027-04-07
Operational date
Withdrawn date
DeveloperBRP Blue Topaz 2, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata